Tuesday, 26 February 2013

An inside update

I finally got around to taking some photos inside!  We've been in for about (maybe even exactly) 4 months now, and the house is well and truly lived in.  I haven't taken pictures specifically of the alfresco, because we are having it tiled soon, so hopefully I'll update with a picture of the finished alfresco (complete with amazing retractable flyscreens) in the not-too-distant future.  We've upsized considerably with this house, so it is still sparsely furnished and no doubt will be for a while.  The furniture that suited our old home well is a little underwhelming now, but we're not in a position to upgrade and even if we were, there's no real reason to.  We have empty rooms galore!  Two bedrooms and the theatre room are currently being used as storage.  But we are loving all the space, inside and out, and we're very happy with how our colour selections have turned out.  There are a few little things around the place that I'd change if we had our time again, but nothing major.  Perhaps one day I'll detail those in a separate post.

Entry

The entry, with its extra high ceiling and extra large door is wonderful and light and grand.

Entry/Front Door

Master Bedroom

The master bedroom is very spacious and light.  We have a privacy lock on the master bedroom door, which is great for keeping the little guy out on my designated sleep-in morning, and for that reason has worked out better than a lock on the ensuite door which we were considering.  We have double roller blinds on the windows in the bedroom, one privacy and one blockout.  The privacy ones are great.  We didn't realise that the bedroom windows look right into the shower and toilet.  Although we added the door to the ensuite, nothing is guaranteed with a toddler with no sense of privacy (in this sense a lock on the ensuite might have been handy, but for various reasons it isn't for us).  During construction we were able to change the window in the WIR to obscure glass, as it also looks into the shower, and although we also have a blind on the window it's nice to have the extra natural light in the WIR and ensuite.

Master Bedroom
Master Bedroom - to ensuite
Ensuite
Ensuite
WIR

Study

The open study is nice, although desks and bookshelves can tend towards messy (well, at least they do for me) and I wouldn't mind the option of shutting the door on it.  But it is nice to be connected to the family when sitting at the desk, and things have never gotten too out of control in there, mess-wise. 

Study
Study

 

Kitchen 

The kitchen is a delight to cook in.   I've never had so much space to cook and prepare.  It might have been nice to offset the sink to one side, as sometimes I feel like I would like one really long section of bench, but the flipside is that no matter how messy it gets in there there's always a clear space to do something else.  Appliances (oven and rangehood) have been good, and the under-cabinet lights are fantastic.  We had our pendant lights installed shortly after we moved in, and while I love them, I'm not sure they're a great fit for the kitchen (but feel free to tell me otherwise; we're not changing them ;) ).

Kitchen
Kitchen

Dining/Living

The living and dining areas are lovely and bright.  With the bifolds open there is an abundance of fresh air, and we love the flow from the entry into the living area and out into the alfresco.  We have heaps of space, as our furniture was bought for a much smaller house, but it's great how open the whole area feels.

Dining
Kitchen/Living/Dining
Living
Living/Dining
Living/Dining/Study

 

Rumpus

Having a rumpus room with a toddler is such a luxury!  The layout is working exactly as we'd hoped, and for the most part toys, bright plastic and 'kid stuff' all stays out of the main living area.  Of course, we spend a lot more time sitting on the floor of the rumpus room than on the couch in the living room ;)

We have utilised the odd recess in the rumpus room as a book wall, which is a fantastic feature in the room, and takes up much less room than a conventional bookcase.  Of course, it doesn't hold anywhere near as many books either.  But I love it and think it was a fantastic use of a strange space.

Rumpus Room
Rumpus Room - Book Wall

 

Bathroom

The large mirror in the bathroom creates so much light.  It's a small bathroom, but functional and adequate for our needs.

Bathroom

 

Laundry 

At the risk of sounding like a broken record - oh, the space!  There's nothing spectacular about the laundry, but it's functional which is all I'm after in a laundry.  We opted for a vegie-sprayer tap in the laundry which has been really handy for cleaning the little guy's cloth nappies.

Laundry

 

Wednesday, 20 February 2013

4 months on

I have a couple of posts saved as drafts that go through some of the things that have happened since my last post (PCI).  But it's looking like I might never finish them!  I intend to, but in case I don't, the short story is "we love it!" and here is an almost complete picture for completeness of the blog.



Last week, after some dramas, our front landscaping was finally completed!  It has made a huge difference to the look of the facade, which I had been thinking was looking a little too monotone.  But the garden has injected some colour and it looks wonderful!  On a whim I unilaterally completely changed our plant selections, but fortunately I'm still married.  The original plan was mostly for structured grasses, but instead I went for some dwarf magnolias, gardenias and some flowering shrubs.

All that's left to do now is the tiling of the portico and alfresco!  And obviously the nature strip, but that's out of our hands - hopefully it's not too far away.  At the moment I'm not sure we'll ever own enough furniture to fill the house, but I'm sure in time we will figure something out!

If I don't get on to finishing the mystery posts in my drafts folder, thanks to everyone for reading along, and I hope that our little corner of the internet has helped others starting out on their own building journey!

Saturday, 20 October 2012

Like a tonne of bricks

...or two.  This morning we were at the house moving bricks, as per my previous post.  Hard work, but worth it if we can get the front garden excavated this week. 

Peeking through the windows we could see that the painters haven't been back, but the dented down pipe has been replaced.  The flyscreen on the laundry door that needs replacing has been removed, but no new one is in its place.  Otherwise it's really hard to say if anything has changed.

I said that we wouldn't have any new photos until handover, but it turns out I lied.  I took the camera along thoday and snapped a few photos.

Facade
Portico
Front door painted

Friday, 19 October 2012

We have a date!

We thought we already had one, but we didn't.  But now we do!  The big day is next Friday, October 26.  Final walkthrough is at 8am and if all goes well we can head straight to the office to pick up the keys.  It's a little disappointing to have the date moved back again, but really a couple of days isn't a big deal and the Friday works a little better in terms of taking leave from work (actually, as we will be taking the day of handover as well as the following week off our time off runs into cup weekend, so we should have a decent break from work, and hopefully some time to settle in and enjoy the new house).  We intend to move in on the day of handover, so appliances will also be delivered that day. 

We have been told that there will be one outstanding issue at handover.  The door handle and seal of the bifold doors cannot be replaced by the end of next week.  I know many would advise not to hand over in these circumstances, but we will insist on the proper documentation and we trust our Site Supervisor when he tells us he will make sure it gets done.  The problems are aesthetic, not functional, so it won't be a hassle for us in the meantime.

The landscaping contractor contacted me yesterday to advise that he will be excavating in the estate on Thursday, and that if we can have the driveway marked out and the bricks moved from the front yard* they will excavate our yard.  This is good news, as it means that our garden shouldn't be too far away.  If we can't move the bricks or have the driveway marked then we will have to wait until this batch of gardens are done before they bring the excavator back.  I found out by chance that our driveway guy lives in the estate, so hopefully it won't be a problem for him to mark it out.

*The bricks.  We had about 3 pallets of bricks left over from the house.  Our Site Supervisor asked if we wanted to keep any and we thought we might use some for a letterbox, so they left behind one pallet for us.  We have since decided to buy a ready made letterbox, so now we need to move the bricks.  We don't have time to sell them, or offer them for free for fear of being stuffed around.  We found a local brick recycling centre that will take them fairly cheap and they are open to 1pm on Saturdays, so we will be spending tomorrow morning taking the bricks there.

Tuesday, 16 October 2012

PCI

Yesterday we finally had our Practical Completion Inspection (PCI).  It went reasonably well; our private inspector also attended and found no major problems.  I have made a separate post which details the progress since the last time we were in the house here.

The inspector's list of defaults (summarised):
  • Concrete floor of the garage dirty (paint stains, blobs of mortar and plaster etc)
  • No draught weather seals to the front door
  • Door handles on the bi-fold doors scratched and acid stained
  • Outer edge of the timber door sill between the garage and house was chipped
  • East side of the capping at the top of the rendered column at the front porch was not fully painted
  • Paint on the aluminium in-fill above the bi-fold doors was scratched
  • Paint on the glass panels of the front door
  • Down pipe on the south-east corner is dented
  • Surplus mortar on the brick sills on the west side of the house
  • Holes around waste pipes in the ensuite vanity were not completely covered
  • Gap between laundry trough cabinet has not been caulked
  • Dents in laminate of laundry cabinet
  • Laundry cabinet doors not flush
  • Sliding wardrobe doors not fitted
  • Mark in vanity shelf in ensuite
  • Joins in largest pantry shelf not flush
  • Interface between toilet and floor tiles in the ensuite has not been caulked
  • Painting: general paint touch ups required
Additional things that we spotted:
  • Missing power point for alarm box
  • Alarm keypad in the wrong place
  • Missing roller bolt from front door*
  • Missing solar panel
  • Kitchen drawers out of alignment
  • Bedroom wardrobe door runner needs replacing (this is why the inspector had cause to note that the wardrobe door was not fitted)
  • Lots of paint touch ups
  • Meter box wrong colour
All of the above are going to be addressed.  Estimated handover is next Wednesday, the 24th of October!  The site supervisor expects that everything will be done by Monday except for the bifold door hande (which will need to be replaced) as the manufacturer's maintenance department is typically a bit slow.

*We were pretty keen on the roller bolt for the front door; basically we wanted something to hold the door shut if we just run out to the letterbox without having to lock the door, as there is no latch (just a pull handle and a deadbolt).  We pushed for it at contract, and were told that we were definitely getting something to that effect, but it was written into the contract for our peace of mind.  At the time we were skeptical that the person we were dealing with really understood what we meant or what was involved, but as long as it was in the contract we were happy.  Of course, there is no roller bolt on the door, but as it is written in the contract they need to work something out for us.

Part two of what we wanted for the door was a hydraulic closer, as it is a very heavy door and we have little fingers in the house.  We were told that although the door supplier does make one for our door, it was not an option with Porter Davis.  We resigned ourselves to adding something after handover, which won't look as nice as the integrated option (and we'll have to organise it ourselves) but will have the same effect.    What does this have to do with PCI?

Our supervisor says that a roller bolt isn't a good option for us, as it will need a large striker plate that will extend past the edge of the door.  However, a hydraulic closer may provide the resistence we are after for the door.  So the supervisor is going to look in to our options in that regard.

General update

Yesterday we did our PCI inspection.  I was writing a PCI post and added this general update about what has changed, but the post was getting a bit unweildy, so I have split the two.  The PCI post is here.

Since the last time we were inside the house was a few weeks ago, we saw a few new things while we were there.  Of course, defects not withstanding, the house is now "complete" so most outstanding matters have been attended to.  I didn't take any pictures yesterday, so probably won't have any picture updates until handover.

Kitchen


I saw for the first time (and Robert for the first time not through a window) the kitchen splashback, and the lights under the overhead cabinets in the kitchen.  With those lights on the splashback looks decidedly grey (as opposed to the brownish tone that it actually is) which I think is a bit of shame, but Robert tells me only I can see a difference.  Besides, it's not like it looks terrible.

Bathrooms


The missing tile in the bathroom has been replaced, and the bath has been fixed in position.  The shower drain "grilles" have also been fitted (they're not really grilles though, I just don't know what they're called).

Roof


The part of the roof that needed repairing has been repaired.

Front Door (and a little about the bi-folds)


The front door has been painted; apparently the painter was only in yesterday morning and the paint was still a bit wet, which is why there was still paint on the glass that will be cleaned.  Apparently the painter was cringing as he painted our beautiful door; paint over stain is not a popular option for this range.  I'm not sure if I've explained it before, but I'll take a minute here to talk about it here.

The look we have gone for in the house is reasonably modern, but neutral.  Our last house had a lot of timber features and while it looked great for the most part, maintenance was an issue.  We were therefore happy enough that aluminium windows and external sliding doors were standard, and decided to go with aluminium bifold doors as well.  The doors would match our windows, and also the sliding door from the rumpus room to the alfresco (if we had gone timber then I would have wanted that door to match so we would have had to upgrade that door).  We like the bifolds not so much for the look, but for the effect they have when open, so for that reason we didn't mind that the aluminium doors, on their own, don't necessarily look as good as timber.  The consistency through the house and the reduced maintenance was benefit enough for us.  We certainly got the impression at the office that it was an uncommon choice, and our Site Supervisor yesterday commented that he had never done a house with aluminium bifolds before.

So, when it came to the front door, it was looking like being the only timber feature of the house.  It is a beautiful door, but as with the bifolds it wasn't going to suit the house or our tastes.  Moreover, much of the striking-ness (??) of this door is in its size, which it doesn't lose by being painted.  We decided to paint the door, and it is still a wonderful, grand feature.

Preparation for after handover


The company we are using for our blinds have confirmed that our blinds are currently being made and should be ready this week; hopefully we can arrange installation as soon as possible after we are in.  We have bought our lights for the front pillars, and have decided on a feature pendant for the bedroom.  We still need to decide on light fittings for the rest of the rooms that don't have down lights.

Wednesday, 10 October 2012

Standing on the outstide, looking in...

Yesterday evening Robert went to check out the house, hoping to see that some painting had been done.  According to the site supervisor, the painters were supposed to come last week (while he was on leave) to do the external painting, but they hadn't shown up.  When he returned from leave on Monday and found out he organised for them to come on Tuesday.

Usually I'm wielding a camera, but all Robert had with him was his phone.  He was in a hurry and we're still locked out, so hopefully the photos below show the progress adequately.


Paint


As hoped, the painters had been and done most of the external painting.  The front door hasn't been painted yet, but otherwise it appears to all be done (although not without faults).

Painting
Paint - Render, Cladding & Eaves
Paint - Eaves
Paint - Alfresco Roof and Beams

 

Doors


The front door handle has been fitted, as well as the metal strip above the bifolds, so they meet the dricks (or at least it looks like they do).  The final door, the rear garage door, has also been painted and hung.

Door handle
Bifolds
Rear garage door

 

Inside


There's not much we know about inside.  We can see that the splashback has been installed, and the lights under the overhead cabinets in the kitchen (which were presumably waiting for the splashback) have been fitted.

Kitchen (through the bifolds)

Meter Box


The meter box has been changed from the ugly building one.  I wasn't there, so I can't be sure it isn't a trick of the light in the photo, but I think it is the wrong colour.  It should be Colourbon Jasper (same as the down pipes) but it looks to me like Woodland Gray (same as the roof and garage door).

Meter Box

PCI is booked in for Monday afternoon, which just happens to be mine and Robert's birthday. Everything is crossed for a handover late next week!