Sunday, 30 September 2012

Counting Down


It's now less than two weeks until PCI, and with all the little things happening to finish the house off it would almost be easier to list what is yet to be done!  The outside is looking great, with the temporary fencing and port-a-loo gone we are just waiting on the external painting.

The taps have been moved to the front of the house as per the estate covenants, and the WIR window has been changed to obscured glass.  This window was an oversight on our part, thinking that we would just manage privacy with blinds, but once construction was underway we realised that without a door between the WIR and the ensuite this window was effectively a window from the street into the ensuite, and privacy became a whole lot more important!  Fortunately our site supervisor was very accommodating and arranged the change for us.

WIR window and taps

Carpet


The big change this week is that we have carpet!

Rumpus room
Master bedroom

In some ways I'm not thrilled with the carpet.  It matches the tiles quite well where they meet, but the carpet doesn't have the same depth as the tiles, which makes it look quite brown.  However, I'm not unhappy with it.  It works with our colour scheme, and although I would probably prefer something lighter, we specifically chose something darker on account of the little guy.

Electrical


The fibre hub has been installed, and the data points are in.  The pre-wiring for the TV wall mounts has also been started.


Data point and TV wall mount


Bathrooms 


The bathrooms are close to complete.  Both toilets are now installed (the one in the ensuite having been delayed due to a crack in the first one delivered.  Both shower screens are installed, and the plumbing appears to be complete.  There is a tile missing in the bathroom, which appears to be intentional to allow access to the bath pipes.  The bath itself is in but is not fixed.
 
Toilet
Bathroom Shower
Bathroom
Ensuite
Ensuite

Kitchen


There hasn't been much action in the kitchen for a little while now.  This week some preparation is underway for the glass splashback, which has been delivered.


Kitchen

Windows and Doors 


Most of the door handles have been fitted (I think it is the doors with privacy sets that are yet to be done.  Door stops have also been fitted throughout.  In the wet areas with tiled skirting the doorstops are attached to the door which makes perfect sense but was interesting as I had never seen that before!

Internal door handles
Linen cupboard


As mentioned above, the window in the WIR has been changed to obscure glass.

WIR


The windows have all been cleaned, and it appears that the broken window we identified early on has been fixed.  The gap above the sliding door in the alfresco has been covered, but the bifolds, bathroom and ensuite window are yet to be done.

Sliding door



Sunday, 13 May 2012

Bedrooms

Off the rumpus room are three additional bedrooms, all three are slightly different in size and layout, but all the features are the same.

 Doors

Bedroom doors will be 820x2340mm Corinthian Balmoral 2 with Lockwood Velocity Summit handles.


Corinthian PBAL2


Lockwood Velocity Summit



We have upgraded the wardrobe doors in the bedrooms to Corinthian Quickslide RMDF2 sliding doors.

Carpet

The bedroom will we carpeted with Belmont "Old Leather" cut pile plush.  I can't find a picture of this.

Walls

Walls will be Wattyl Flokati

Wattyl Flokati


Electrical

We have added one double power point to each room, for a total of two in each room.

Double power point







Lighting

The light in each bedroom will be a single batten light to the centre of the room.


Batten light

Tuesday, 8 May 2012

Rumpus

Doors

There is no door from the kitchen into the rumpus, however doors into the bedrooms and laundry will be 820x2340mm Corinthian Balmoral 2 with Lockwood Velocity Summit handles.


Corinthian PBAL2


Lockwood Velocity Summit



To the alfresco will be an aluminium sliding door, 2100x2400 in Colorbond Paperbark.

Carpet

The bedroom will we carpeted with Belmont "Old Leather" cut pile plush.  I can't find a picture of this.

Walls

Walls will be Wattyl Flokati

Wattyl Flokati


Electrical

The rumpus room we have upgraded the single double power point to a quad power point.  We have also added pre-wiring for a wall mounted TV which will provide an additional single power point, and added a double power point to the other side of the room.

Double power point


Quad point


The rumpus room will also have a phone/data, TV and pay TV point.

 

Lighting

The light in the rumpus room will be a single batten light to the centre of the room.


Batten light

Saturday, 5 May 2012

Theatre

Doors

We have added a door to the theatre, the Corinthian Balmoral 2, 2340x820mm in white.  Door handle will be Lockood Velocity Summit L1.

Corinthian PBAL2

Lockwood Velocity Summit


Carpet

The bedroom will we carpeted with Belmont "Old Leather" cut pile plush.  I can't find a picture of this.

Walls

Walls will be Wattyl Flokati
Wattyl Flokati

Electrical

We have added one double power point to the master bedroom, for a total of 3.  There will be one on either side of the bed, and one opposite.  We will also have a phone/data, TV and pay TV point opposite the bed, one of four such points through the house.

Double power point.

Lighting

The light in the master bedroom will be a single batten light to the centre of the room.

Batten light

Sunday, 22 April 2012

Master Bedroom

Doors

The master bedroom entrance is a double (well, 1.5 door) set from the entry.  The doors will be Corinthian Balmoral 2 in white, one in 2340x820mm and the other 2340x520mm.  Door handles will be Lockwood Velocity Summit L1 with privacy set.

Corinthian PBAL 2 Double
Lockwood Velocity Summit
We have added a door to the ensuite, the Corinthian Balmoral 2, 2340x820mm in white.  Door handle will be Lockood Velocity Summit L1.

Corinthian PBAL2

Lockwood Velocity Summit


Carpet

The bedroom will we carpeted with Belmont "Old Leather" cut pile plush.  I can't find a picture of this.

Walls

Walls will be Wattyl Flokati
Wattyl Flokati
 

Electrical

We have added two double power points to the master bedroom, for a total of 3.  There will be one on either side of the bed, and one opposite.  We will also have a phone/data, TV and pay TV point opposite the bed, one of four such points through the house.

Double power point.

Lighting

The light in the master bedroom will be a single batten light to the centre of the room.

Batten light