Showing posts with label Painting. Show all posts
Showing posts with label Painting. Show all posts

Wednesday, 10 October 2012

Standing on the outstide, looking in...

Yesterday evening Robert went to check out the house, hoping to see that some painting had been done.  According to the site supervisor, the painters were supposed to come last week (while he was on leave) to do the external painting, but they hadn't shown up.  When he returned from leave on Monday and found out he organised for them to come on Tuesday.

Usually I'm wielding a camera, but all Robert had with him was his phone.  He was in a hurry and we're still locked out, so hopefully the photos below show the progress adequately.


Paint


As hoped, the painters had been and done most of the external painting.  The front door hasn't been painted yet, but otherwise it appears to all be done (although not without faults).

Painting
Paint - Render, Cladding & Eaves
Paint - Eaves
Paint - Alfresco Roof and Beams

 

Doors


The front door handle has been fitted, as well as the metal strip above the bifolds, so they meet the dricks (or at least it looks like they do).  The final door, the rear garage door, has also been painted and hung.

Door handle
Bifolds
Rear garage door

 

Inside


There's not much we know about inside.  We can see that the splashback has been installed, and the lights under the overhead cabinets in the kitchen (which were presumably waiting for the splashback) have been fitted.

Kitchen (through the bifolds)

Meter Box


The meter box has been changed from the ugly building one.  I wasn't there, so I can't be sure it isn't a trick of the light in the photo, but I think it is the wrong colour.  It should be Colourbon Jasper (same as the down pipes) but it looks to me like Woodland Gray (same as the roof and garage door).

Meter Box

PCI is booked in for Monday afternoon, which just happens to be mine and Robert's birthday. Everything is crossed for a handover late next week!

Monday, 8 October 2012

Nothing to see here (updated 5 hours later)

The title pretty much says it all!  For the first time since construction started, we didn't visit the block this weekend.  Robert was out there late last week to get a second quote on the alfresco screens, and found that for the first time, the house was completely locked up.  I guess it had to happen eventually!

However Robert was able to see a couple of changes.  Most notably, the splashback has been installed and all the windows and doors have flyscreens, with the exception of the bifolds and the front door.  The bifolds won't have a screen (they don't come under the BAL definition requiring one) but the front door is supposed to have one.  Although in truth, we don't care if they don't put one on the front door!

While we don't know what is left to do inside, we do know that (as of Thursday) the external painting is yet to be started.  Such a shame given the beautiful weather last week and the forecast rain for this week.

The tiles have been cleaned, presumably in preparation for PCI, which is scheduled for this Wednesday.  We are having some troubles booking our independent inspector, but hopefully we are able to sort that out and go ahead this week!

UPDATE 2pm


Robert has spoken to our site supervisor, who says that the house won't be ready for PCI on Wednesday.  A shame, but it does mean that we can go ahead with our usual inspector on Monday.

The supervisor also mentioned that the front door is going to be replaced with a fire-resistent version (we noticed a 'spare' door had been delivered a few weeks ago, but figured it was a mistake).  This means that we don't have to have an ugly flyscreen door covering our feature entrance door!  It's a great win for us!