Nothing to see here (updated 5 hours later)

The title pretty much says it all!  For the first time since construction started, we didn't visit the block this weekend.  Robert was out there late last week to get a second quote on the alfresco screens, and found that for the first time, the house was completely locked up.  I guess it had to happen eventually!

However Robert was able to see a couple of changes.  Most notably, the splashback has been installed and all the windows and doors have flyscreens, with the exception of the bifolds and the front door.  The bifolds won't have a screen (they don't come under the BAL definition requiring one) but the front door is supposed to have one.  Although in truth, we don't care if they don't put one on the front door!

While we don't know what is left to do inside, we do know that (as of Thursday) the external painting is yet to be started.  Such a shame given the beautiful weather last week and the forecast rain for this week.

The tiles have been cleaned, presumably in preparation for PCI, which is scheduled for this Wednesday.  We are having some troubles booking our independent inspector, but hopefully we are able to sort that out and go ahead this week!

UPDATE 2pm


Robert has spoken to our site supervisor, who says that the house won't be ready for PCI on Wednesday.  A shame, but it does mean that we can go ahead with our usual inspector on Monday.

The supervisor also mentioned that the front door is going to be replaced with a fire-resistent version (we noticed a 'spare' door had been delivered a few weeks ago, but figured it was a mistake).  This means that we don't have to have an ugly flyscreen door covering our feature entrance door!  It's a great win for us!

Sunday, 16 September 2012

Tiled

This week we have seen a big change in the inside of the house, and a couple of small changes to the outside.  We're also trying to organise some of the "finishing touches" that we will be doing after handover.

Exterior


Although it was installed a couple of weeks ago, today we saw the front of the garage door for the first time.

Garage Door

The cladding on the facade and plastering under the eaves have also been completed.

Cladding Completed
Cladding Completed

Tiles


The big story this week is the tiles.

We were told that the tiles would be finished this weekend.  Well, they're not quite finished, but they are close.  They need a clean, and there is a tile missing in the bathroom and a little grout to be done in the ensuite, but the kitchen/study/living area is done, as is the laundry.

Kitchen/living
Dining
Living
Bathroom
Bathroom shower
Ensuite
Ensuite shower
Laundry splashback


None and all of the pictures show the colour of the tiles well!  With the exception of the splashbacks they are all the same tiles, and look completely different according to the light; from a fairly dark brown to a light grey.  Ever since our selection I've been a little (OK, a lot) worried about how they would turn out, but they look great; we're really happy with them.

Some other things


Blinds


Yesterday morning we went back to our preferred blinds supplier, after spending the last few weekends visiting showrooms and getting quotes.  We have gone with a small, independent company based in Coburg who were not only the lowest quote but offered by far the best service.

We will be having roller blinds throughout the house, excepting the bathroom, ensuite, laundry, and rumpus room sliding door.  The master bedroom at the front of the house will have double privacy/blockout blinds, and the rest single blockout.  Our chosen fabric for the blinds is Stamford Lava Blockout.


Stamford Lava Blockout


Next Saturday they will come and measure the windows (having quoted off the plan) and with a three week lead time hopefully we will be able to have them installed shortly after handover.

Landscaping


This morning we met with the landscaper nominated by the developer.  Our front yard will be landscaped in accordance with the development guidelines at the developers expense.   As we spoke to him, the landscaper marked out our landscape plan which will consist of a path to the portico with garden beds either side, a garden bed along the side of the driveway, and another along the front of the house, and the rest lawn.  He will do some drawings to submit to the developer and once approved we will be placed in the queue for the work to be done.  Currently it's a long queue, so it's good that we're having out plans submitted before handover.  The landscaper said it would hopefully be done "before Christmas".

We are also in the process of pricing landscaping the backyard, which will simply be grass.

Alfresco and portico floors


We had been at a bit of a loss about what to do on the alfresco and portico floors, which are currently just concrete slab.  Then, during the week I discovered that there is an external version of our internal tiles.

Wet Cement External

 

Although the tiles are the same range as our internal tiles they look quite different; mostly due to the internal ones being polished.  We feel that this will provide nice continuity between the indoor and outdoor areas without being too "matchy-matchy".  We are currently getting quotes from tilers to do this relatively small job.

 

Alfresco flyscreen


We are concerned about the ingress of bugs into the house when taking advantage of our lovely big bifold doors, so looked for a solution a bit more robust than moving air (although we do intend to put a fan in the alfresco).  We came across these retractable fly screens for bifold doors and other large openings.

Retractable flyscreen

We visited a local showroom and met a very friendly and helpful salesperson.  He was also an excellent salesman who has all but talked us into doubling our order!  His suggestion was to put two screens on both of the open sides of the alfresco, rather than on the bifold doors.  The advantages being that we essentially create an outdoor room in which we can eat bug-free or open up as we like, and we can still open up the bifolds and guard against bugs.  This idea is one of the reasons we are trying to integrate the internal and external tiles (as above).  It will be our most expensive addition if we go ahead, but we are both keen to do it.

Driveway


We have now gotten two quotes for an exposed aggregate driveway and are in the process of getting a couple more.  We hope to have the driveway poured as soon as possible after handover (in fact, our estate guidelines state that the driveway must be completed before the dwelling is occupied, so we need to get it done!)

Lighting


We started looking for light fittings a couple of weeks ago, focusing on the feature pendants over the island bench.  We have all but settled on these gorgeous lights with edison bulbs.

Mercator Toledo 30cm


The rest of the house has us completely stumped though!

Tuesday, 11 September 2012

PCI booked

This morning our site supervisor called with an exciting update!  He said that with the beautiful weather today the cladding on the exterior will be completed, and the tiles will be finished this week.  He has now booked in the rest of the trades, and also booked in our Practical Completion Inspection (PCI) for 10 October.  All things going well we will be settling on 17 October!  That's just a little over 5 weeks away!

Monday, 10 September 2012

Tiles

We're at the business end now!

Tiles


On Saturday we arrived at the site to find the tilers working.  It looked like they had just started, with a couple of dozen tiles laid in the ensuite and laundry.  We didn't stick around long because we had the little guy with us and we didn't want to get in their way but did get a peek at the tiles.

Piles of tiles
Tiles waiting...

The tiles had been distributed through the house.

Laundry from outside
Laundry from inside
There were two guys working, one in the ensuite and one in the laundry.  We were actually lucky they were there, as for the first time our 'secret' entrance was locked (presumably to protect the tiles which would have been conveniently packaged for a thief to make off with).  It was also nice to see them working on a Saturday, as it gives me the impression they are keen to get the job finished.

Waterproofing


The showers and bath have been waterproofed in preparation for tiling.

Bathroom Shower
Bath

Painting


Obviously, to get to this point the internal painting has been completed.

Painting finished

With the tiling underway, we hope that our site supervisor will be able to give us an estimated completion date soon.  When we met with him a few weeks ago he told us that once the tilers give an indication of how long they will take he books in the rest of the trades and have a good idea of our 'best case scenario' completion.  So we're hanging out to hear from him this week.

Friday, 4 May 2012

Bathroom and Toilet

Our bathroom and toilet are separate, but it seemed silly to make a post just for the toilet, so I have combined them.  Specs are as follows:

Doors

Bathroom and toilet doors will be the Corinthian Balmoral 2, 2340x820mm in white.  Door handles will be Lockood Velocity Summit L1.

Corinthian PBAL2

Lockwood Velocity Summit


Shower

The bathroom shower will be the standard 900x900mm.  The shower base will be tiled and the screen semi-frameless.  We have added a 425x425mm niche to the shower. We have upgraded the standard shower head and tap to the Olympic 3 function hand held shower rail, as in the ensuite.

 

Vanity

The bathroom will have a single vanity.  The basin will be Stylus Symphony and the tap a Caroma Aqua Basin Mixer, as in the ensuite.

Stylus Symphony
Caroma Aqua Basin Mixer


We have upgraded the vanity countertop to Caesarstone in Latte.  The cabinets below will be laminex smoky sappelle.

Caesarstone - Latte
Laminex - Smoky Sappelle





We have upgraded the mirror above the vanity to extend to external wall, above the bath.

 

Bath

The bath will be the standard Caroma Maxton.

Caroma Maxton 1675

 

Glazing

The large window above the bath has been upgraded to obscure Spotswood glazing.


Spotswood Glazing




Tiles

Floor and shower tiles will be National Tiles "Wet Cement" 300x600mm polished porcelain tiles.  Vanity splashback will be National Tiles "Silk Olive" 300x600mm, with the line pattern horizontal.

National Tiles - Wet Cement
National Tiles - Silk Olive

 

Walls

Walls will be Wattyl Flokati

Wattyl - Flokati
 

 

Electrical

We have added a double power point inside the bathroom cabinet, for a total of two double power points.

Double power point

 

Lighting - Bathroom

The bathroom comes standard with a single batten light in the centre of the room and an exhaust fan over the shower.

Batten light
Exhaust fan


 

Toilet

The toilet is the standard Raymor Bella Plus Link Suite II.

Raymor Bella Plus Link Suite II

 

Lighting - Toilet

The toilet comes standard with a single batten light and exhaust fan with draftstoppa, switched together.

Batten Light
Exhaust fan

Draftstoppa

Sunday, 22 April 2012

Living and Dining

The living and dining areas are part of a lovely open plan area including the kitchen and the study.  I will deal with them together as it is simpler to do so.

Doors

The only doors in this area are out to the alfresco.  We have upgraded the standard sliding door to aluminium, 5-leaf bifold doors.  To accommodate the bifolds, the opening on the wall had to be increased to 2100x3600mm.

Walls

Walls will be Wattyl Flokati

Wattyl - Flokati

Tiles

In keeping with the rest of the area, the tiles will be National Tiles "Wet Cement" 300x600mm polished porcelain tiles.

National Tiles - Wet Cement

Lighting

Standard for this area is two batten lights, one over the living area and one over the dining area.  We have upgraded these to eight LED downlights; four in each area.  The two sets of four will be switched separately, and both will be double switched to both ends of the room.

LED Downlight

Electrical

The dining area comes standard with one double power point, and we have not added any to this area.  In the living area we have upgraded the single double power point to a quad power point.  We have also added pre-wiring for a wall mounted TV in the living area, which will provide an additional single power point.

Double power point

Quad power point

The living area will also have a phone/data, TV and pay TV point.

Study


The study is part of the open plan living/dining/kitchen area.  There is no door, and the two half walls have large voids in them.

Tiles

The study, despite being part of the open plan living area, comes standard with carpet.  We opted instead to upgrade to tiles for continuity in the house.

Tiles will be National Tiles "Wet Cement"

National Tiles - Wet Cement

Walls

Walls will be Wattyl Flokati.

Wattyl - Flokati

 

Lighting

We have upgraded the standard batten light fitting in favour of 4 LED downlights.

LED downlight

Electrical

We have changed the standard double power point to a single quad power point.  The study will also have a phone/data point.

Quad Power Point