I have a couple of posts saved as drafts that go through some of the things that have happened since my last post (PCI). But it's looking like I might never finish them! I intend to, but in case I don't, the short story is "we love it!" and here is an almost complete picture for completeness of the blog.
Last week, after some dramas, our front landscaping was finally completed! It has made a huge difference to the look of the facade, which I had been thinking was looking a little too monotone. But the garden has injected some colour and it looks wonderful! On a whim I unilaterally completely changed our plant selections, but fortunately I'm still married. The original plan was mostly for structured grasses, but instead I went for some dwarf magnolias, gardenias and some flowering shrubs.
All that's left to do now is the tiling of the portico and alfresco! And obviously the nature strip, but that's out of our hands - hopefully it's not too far away. At the moment I'm not sure we'll ever own enough furniture to fill the house, but I'm sure in time we will figure something out!
If I don't get on to finishing the mystery posts in my drafts folder, thanks to everyone for reading along, and I hope that our little corner of the internet has helped others starting out on their own building journey!
Showing posts with label Facade. Show all posts
Showing posts with label Facade. Show all posts
Wednesday, 20 February 2013
Saturday, 20 October 2012
Like a tonne of bricks
...or two. This morning we were at the house moving bricks, as per my previous post. Hard work, but worth it if we can get the front garden excavated this week.
Peeking through the windows we could see that the painters haven't been back, but the dented down pipe has been replaced. The flyscreen on the laundry door that needs replacing has been removed, but no new one is in its place. Otherwise it's really hard to say if anything has changed.
I said that we wouldn't have any new photos until handover, but it turns out I lied. I took the camera along thoday and snapped a few photos.
Peeking through the windows we could see that the painters haven't been back, but the dented down pipe has been replaced. The flyscreen on the laundry door that needs replacing has been removed, but no new one is in its place. Otherwise it's really hard to say if anything has changed.
I said that we wouldn't have any new photos until handover, but it turns out I lied. I took the camera along thoday and snapped a few photos.
![]() |
| Facade |
![]() |
| Portico |
![]() |
| Front door painted |
Wednesday, 10 October 2012
Standing on the outstide, looking in...
Yesterday evening Robert went to check out the house, hoping to see that some painting had been done. According to the site supervisor, the painters were supposed to come last week (while he was on leave) to do the external painting, but they hadn't shown up. When he returned from leave on Monday and found out he organised for them to come on Tuesday.
Usually I'm wielding a camera, but all Robert had with him was his phone. He was in a hurry and we're still locked out, so hopefully the photos below show the progress adequately.
As hoped, the painters had been and done most of the external painting. The front door hasn't been painted yet, but otherwise it appears to all be done (although not without faults).
The front door handle has been fitted, as well as the metal strip above the bifolds, so they meet the dricks (or at least it looks like they do). The final door, the rear garage door, has also been painted and hung.
There's not much we know about inside. We can see that the splashback has been installed, and the lights under the overhead cabinets in the kitchen (which were presumably waiting for the splashback) have been fitted.
The meter box has been changed from the ugly building one. I wasn't there, so I can't be sure it isn't a trick of the light in the photo, but I think it is the wrong colour. It should be Colourbon Jasper (same as the down pipes) but it looks to me like Woodland Gray (same as the roof and garage door).
PCI is booked in for Monday afternoon, which just happens to be mine and Robert's birthday. Everything is crossed for a handover late next week!
Usually I'm wielding a camera, but all Robert had with him was his phone. He was in a hurry and we're still locked out, so hopefully the photos below show the progress adequately.
Paint
As hoped, the painters had been and done most of the external painting. The front door hasn't been painted yet, but otherwise it appears to all be done (although not without faults).
| Painting |
| Paint - Render, Cladding & Eaves |
| Paint - Eaves |
| Paint - Alfresco Roof and Beams |
Doors
The front door handle has been fitted, as well as the metal strip above the bifolds, so they meet the dricks (or at least it looks like they do). The final door, the rear garage door, has also been painted and hung.
| Door handle |
| Bifolds |
| Rear garage door |
Inside
There's not much we know about inside. We can see that the splashback has been installed, and the lights under the overhead cabinets in the kitchen (which were presumably waiting for the splashback) have been fitted.
| Kitchen (through the bifolds) |
Meter Box
The meter box has been changed from the ugly building one. I wasn't there, so I can't be sure it isn't a trick of the light in the photo, but I think it is the wrong colour. It should be Colourbon Jasper (same as the down pipes) but it looks to me like Woodland Gray (same as the roof and garage door).
| Meter Box |
PCI is booked in for Monday afternoon, which just happens to be mine and Robert's birthday. Everything is crossed for a handover late next week!
Sunday, 16 September 2012
Tiled
This week we have seen a big change in the inside of the house, and a couple of small changes to the outside. We're also trying to organise some of the "finishing touches" that we will be doing after handover.
Although it was installed a couple of weeks ago, today we saw the front of the garage door for the first time.
The cladding on the facade and plastering under the eaves have also been completed.
The big story this week is the tiles.
We were told that the tiles would be finished this weekend. Well, they're not quite finished, but they are close. They need a clean, and there is a tile missing in the bathroom and a little grout to be done in the ensuite, but the kitchen/study/living area is done, as is the laundry.
None and all of the pictures show the colour of the tiles well! With the exception of the splashbacks they are all the same tiles, and look completely different according to the light; from a fairly dark brown to a light grey. Ever since our selection I've been a little (OK, a lot) worried about how they would turn out, but they look great; we're really happy with them.
Yesterday morning we went back to our preferred blinds supplier, after spending the last few weekends visiting showrooms and getting quotes. We have gone with a small, independent company based in Coburg who were not only the lowest quote but offered by far the best service.
We will be having roller blinds throughout the house, excepting the bathroom, ensuite, laundry, and rumpus room sliding door. The master bedroom at the front of the house will have double privacy/blockout blinds, and the rest single blockout. Our chosen fabric for the blinds is Stamford Lava Blockout.
Next Saturday they will come and measure the windows (having quoted off the plan) and with a three week lead time hopefully we will be able to have them installed shortly after handover.
This morning we met with the landscaper nominated by the developer. Our front yard will be landscaped in accordance with the development guidelines at the developers expense. As we spoke to him, the landscaper marked out our landscape plan which will consist of a path to the portico with garden beds either side, a garden bed along the side of the driveway, and another along the front of the house, and the rest lawn. He will do some drawings to submit to the developer and once approved we will be placed in the queue for the work to be done. Currently it's a long queue, so it's good that we're having out plans submitted before handover. The landscaper said it would hopefully be done "before Christmas".
We are also in the process of pricing landscaping the backyard, which will simply be grass.
We had been at a bit of a loss about what to do on the alfresco and portico floors, which are currently just concrete slab. Then, during the week I discovered that there is an external version of our internal tiles.
Although the tiles are the same range as our internal tiles they look quite different; mostly due to the internal ones being polished. We feel that this will provide nice continuity between the indoor and outdoor areas without being too "matchy-matchy". We are currently getting quotes from tilers to do this relatively small job.
We are concerned about the ingress of bugs into the house when taking advantage of our lovely big bifold doors, so looked for a solution a bit more robust than moving air (although we do intend to put a fan in the alfresco). We came across these retractable fly screens for bifold doors and other large openings.
We visited a local showroom and met a very friendly and helpful salesperson. He was also an excellent salesman who has all but talked us into doubling our order! His suggestion was to put two screens on both of the open sides of the alfresco, rather than on the bifold doors. The advantages being that we essentially create an outdoor room in which we can eat bug-free or open up as we like, and we can still open up the bifolds and guard against bugs. This idea is one of the reasons we are trying to integrate the internal and external tiles (as above). It will be our most expensive addition if we go ahead, but we are both keen to do it.
We have now gotten two quotes for an exposed aggregate driveway and are in the process of getting a couple more. We hope to have the driveway poured as soon as possible after handover (in fact, our estate guidelines state that the driveway must be completed before the dwelling is occupied, so we need to get it done!)
We started looking for light fittings a couple of weeks ago, focusing on the feature pendants over the island bench. We have all but settled on these gorgeous lights with edison bulbs.
The rest of the house has us completely stumped though!
Exterior
Although it was installed a couple of weeks ago, today we saw the front of the garage door for the first time.
![]() |
| Garage Door |
The cladding on the facade and plastering under the eaves have also been completed.
![]() |
| Cladding Completed |
![]() |
| Cladding Completed |
Tiles
The big story this week is the tiles.
We were told that the tiles would be finished this weekend. Well, they're not quite finished, but they are close. They need a clean, and there is a tile missing in the bathroom and a little grout to be done in the ensuite, but the kitchen/study/living area is done, as is the laundry.
![]() |
| Kitchen/living |
![]() |
| Dining |
![]() |
| Living |
![]() |
| Bathroom |
![]() |
| Bathroom shower |
![]() |
| Ensuite |
![]() |
| Ensuite shower |
![]() |
| Laundry splashback |
None and all of the pictures show the colour of the tiles well! With the exception of the splashbacks they are all the same tiles, and look completely different according to the light; from a fairly dark brown to a light grey. Ever since our selection I've been a little (OK, a lot) worried about how they would turn out, but they look great; we're really happy with them.
Some other things
Blinds
Yesterday morning we went back to our preferred blinds supplier, after spending the last few weekends visiting showrooms and getting quotes. We have gone with a small, independent company based in Coburg who were not only the lowest quote but offered by far the best service.
We will be having roller blinds throughout the house, excepting the bathroom, ensuite, laundry, and rumpus room sliding door. The master bedroom at the front of the house will have double privacy/blockout blinds, and the rest single blockout. Our chosen fabric for the blinds is Stamford Lava Blockout.
![]() |
| Stamford Lava Blockout |
Next Saturday they will come and measure the windows (having quoted off the plan) and with a three week lead time hopefully we will be able to have them installed shortly after handover.
Landscaping
This morning we met with the landscaper nominated by the developer. Our front yard will be landscaped in accordance with the development guidelines at the developers expense. As we spoke to him, the landscaper marked out our landscape plan which will consist of a path to the portico with garden beds either side, a garden bed along the side of the driveway, and another along the front of the house, and the rest lawn. He will do some drawings to submit to the developer and once approved we will be placed in the queue for the work to be done. Currently it's a long queue, so it's good that we're having out plans submitted before handover. The landscaper said it would hopefully be done "before Christmas".
We are also in the process of pricing landscaping the backyard, which will simply be grass.
Alfresco and portico floors
We had been at a bit of a loss about what to do on the alfresco and portico floors, which are currently just concrete slab. Then, during the week I discovered that there is an external version of our internal tiles.
![]() |
| Wet Cement External |
Alfresco flyscreen
We are concerned about the ingress of bugs into the house when taking advantage of our lovely big bifold doors, so looked for a solution a bit more robust than moving air (although we do intend to put a fan in the alfresco). We came across these retractable fly screens for bifold doors and other large openings.
![]() |
| Retractable flyscreen |
We visited a local showroom and met a very friendly and helpful salesperson. He was also an excellent salesman who has all but talked us into doubling our order! His suggestion was to put two screens on both of the open sides of the alfresco, rather than on the bifold doors. The advantages being that we essentially create an outdoor room in which we can eat bug-free or open up as we like, and we can still open up the bifolds and guard against bugs. This idea is one of the reasons we are trying to integrate the internal and external tiles (as above). It will be our most expensive addition if we go ahead, but we are both keen to do it.
Driveway
We have now gotten two quotes for an exposed aggregate driveway and are in the process of getting a couple more. We hope to have the driveway poured as soon as possible after handover (in fact, our estate guidelines state that the driveway must be completed before the dwelling is occupied, so we need to get it done!)
Lighting
We started looking for light fittings a couple of weeks ago, focusing on the feature pendants over the island bench. We have all but settled on these gorgeous lights with edison bulbs.
![]() |
| Mercator Toledo 30cm |
The rest of the house has us completely stumped though!
Labels:
Alfresco,
Blinds,
Driveway,
Facade,
Flyscreens,
Garage,
Landscaping,
Lighting,
Portico,
Tiles
Sunday, 26 August 2012
Fixing Stage Complete
On Friday, three weeks after we were told fixing stage would be complete, we got the call saying the fixing stage is complete! There were only a couple of visible changes when we visited the site yesterday, but it was the most encouraging progress we've seen in a little while.
Finally, the architraves and skirting are complete (and correct!)
All the wardrobe doors have been hung, meaning all internal doors are now hung.
The cladding on the facade in now underway, the first change in the facade that we have seen in a little while.
The ceiling under the eaves and portico has been started.
We noticed that some of the cornice above the front door has been ripped off; we'll see what the site supervisor has to say about it.
The little guy came with us on Saturday, and had a ball running around the house!
Architraves & Skirting
| Architraves and Skirting |
Wardrobes
| Bed 4 Wardrobe |
| Bed 4 Wardrobe |
Facade
| Facade |
| Cladding |
Eaves
| Eaves |
| Portico |
Cornice
| Cornice |
What it's all about
Because I can't resist...
![]() |
| Loves the new house! |
![]() |
| Who's there? |
The little guy came with us on Saturday, and had a ball running around the house!
Labels:
Architraves,
Cladding,
Cornice,
Eaves,
Facade,
Internal Doors,
Portico,
Skirting,
Wardrobes
Sunday, 19 August 2012
Slow progress
Yesterday's visit was a bit disappointing again. There has been progress, but it's just been fixing mistakes and it feels so slow. Our site supervisor had told us that we could expect the cladding on the facade to have been completed by today, but it wasn't (although it appears to have been delivered. We were also told that the architraves and skirting boards would be replaced thins week, but there is still progress to be made on that - most of the architraves are done, however only one piece of skirting board has been set.
| No change |
| Cladding delivered |
| Old architraves |
| New architraves |
Subscribe to:
Posts (Atom)